Abstract

As part of the research project "In-situ bioremediation of oil polluted soil" a case study is in progress. The aim of the study is to establish the technical and financial feasibility of the method used. An interim evaluation was made to predict how long it will take for the remediation to be fully realized. From the prediction it is concluded that the remediation could reasonably be fully realized in september 1993. Based on the conclusions it is proposed to continue the remediation till september 1993.

Resterend

Grootte
0MB