NIPT available as standard option for all pregnant women from 1 April From 1 April 2023, the Non-Invasive Prenatal Test (NIPT) will be available to all pregnant women. They do not have to take part in a scientific study for this.
People with impaired immunity invited for repeat vaccination From 19 April on, people who have moderately or severely impaired immunity will receive their invitation for a repeat vaccination against COVID-19.
RIVM recalls fill needles for COVID-19 vaccination at supplier’s request As of today, RIVM is recalling the fill needles made by MLS/Sol-Millenium Europe as a precaution, following a safety alert from the supplier. This applies to the SOL-M™ Blunt Fill Needle (REF 110022, LOT 05103013).
Need for circular use of materials in construction Construction and demolition waste are being recycled on a large scale to use as a foundation for e.g. roads, but recycled building materials are hardly ever used in the construction of buildings.
ICP M&M meetings in 2012 The 22nd CCE workshop 2012 and 28th Task Force Meeting of the ICP M&M are held 16-19 April 2012 in Warsaw, Poland