Emphasising safety and sustainability in circular design A stronger focus on safety, health and sustainability is needed in designing circular products. When basic resources are re-used in new products, health risks should be avoided.
Updated immunisation recommendation for measles: early vaccination before travel A number of European countries are currently seeing outbreaks of measles. Before the start of the summer season, RIVM has therefore updated its immunisation recommendation for measles.
Young people who use screens before sleeping have more sleep problems Young people (13-18 years) who use light-emitting screens daily in the hour before going to sleep have more sleep problems.
RIVM will make measurements around the Sint Maarten landfill From 21 January 2019, a team from RIVM will travel to Sint Maarten to make measurements and take samples at various locations around the landfill in Philipsburg.
Influenza-like Illness Incidence Is Not Reduced by Influenza Vaccination Influenza vaccination reduces the number of influenza virus infections but not the overall number of illness.
Risk of measles outbreaks increases with decreasing vaccination coverage Vaccination coverage for vaccinations in the Dutch National Vaccination Program (NIP) decreased slightly by about half a percent for the third consecutive year.
EFSA agrees with RIVM that potential effect of BPA on the immune system requires further attention RIVM expressed concerns on the effects of bisphenol a (BPA) on the immune system in a report issued in March 2016.
Moderate flu season Last winter season, the duration and severity of the influenza epidemic was moderate compared to previous years.
RIVM recommends more stringent EU standards BPA More stringent European standards for safe exposure of workers and consumers to bisphenol A (BPA) were proposed in 2014 and 2015.
Need for circular use of materials in construction Construction and demolition waste are being recycled on a large scale to use as a foundation for e.g. roads, but recycled building materials are hardly ever used in the construction of buildings.